Search
.Management Sciences
A. minimum pool level and maximum pool level
B. minimum pool level and normal pool level
C. normal pool level and maximum pool level
D. river bed and minimum pool level
Related Mcqs:
- The most suitable material for the central impervious core of a zoned embankment type dam is_______________?
- A. clay B. coarse sand C. silty clay D. clay mixed with fine sand...
- A repelling groyne is aligned________________?
- A. pointing upstream B. pointing downstream C. perpendicular to bank D. parallel to bank...
- Which of the following canal outlets maintains a constant discharge ?
- A. non-modular outlet B. flexible outlet C. rigid module D. none of the above...
- Seepage through embankments in an earthen dam is controlled by_______________?
- A. drainage filters B. relief wells C. drain trenches D. provision of downstream berms...
- To determine the discharge at a section in a stream from its rating curve, the required data are_______________?
- 1) slope of water surface at the section 2) stage at the section 3) current meter readings at the section The correct answer is? A. (1) and (2) B. (2) and (3) C. only (2) D. only (3)...
Recent Comments