Search
.Management Sciences
A. 1500 vehicles per hour
B. 2000 vehicles per hour
C. 2500 vehicles per hour
D. 3000 vehicles per hour
Related Mcqs:
- The sequence of four stages of survey in a highway alignment is______________?
- A. reconnaissance, map study, preliminary survey and detailed survey B. map study, preliminary survey, reconnaissance and detailed survey C. map study, reconnaissance, preliminary survey and detailed survey D. preliminary survey, map study, reconnaissance and detailed survey...
- The terrain may be classified as rolling terrain if the cross slope of land is______________?
- A. upto 10% B. between 10% and 25% C. between 25% and 60% D. more than 60%...
- Select the correct statement__________________?
- A. Traffic volume should always be more than traffic capacity B. Traffic capacity should always be more than traffic volume C. Spot speed is the average speed of a vehicle at a specified section D. 85th percentile speed is more than 98th percentile speed...
- If aggregate impact value is 20 to 30 percent, then it is classified as_______________?
- A. exceptionally strong B. strong C. satisfactory for road surfacing D. unsuitable for road surfacing...
- For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is________________?
- A. dry rolling, wet rolling, application of screening and application of filler B. dry rolling, application of filler, wet rolling and application of screening C. dry rolling, application of screening, wet rolling and application of filler D. dry rolling, application of screening, application of filler and wet rolling...
Recent Comments