A. 0.25 kg
B. 0.50 kg
C. 0.75 kg
D. 1.00 kg
Related Mcqs:
- The brick work is not measured in cu m in case of_______________?
- A. One or more than one brick wall B. Brick work in arches C. Reinforced brick work D. Half brick wall...
- Pick up the correct statement from the following ?
- A. Pointing is measured in sq.m B. Plastering is measured in sq.m C. Glazing is measured in sq.m D. All the above...
- The expected out turn of 2.5 cm cement concrete floor per mansion per day__________________?
- A. 2.5 sqm B. 5.0 sqm C. 7.5 sqm D. 10 sqm...
- Pick up the correct statement from the following?
- A. The incidental expenses of a miscellaneous character which could not be predicted during preparation of the estimate, is called contingencies B. Additional supervising staff engaged at work site, is called work charged establishment C. Detailed specifications specify qualities, quantities and the proportions of materials to be used for a particular item D. All the … Pick up the correct statement from the following?Read More...
- The item of steel work which is measured in sq.m, is_________________?
- A. Collapsible gates B. Rolling shutters C. Ventilators and glazing D. All the above...