Search
.Management Sciences
A. 0.01 cum
B. 0.02 cum
C. 0.03 cum
D. 0.04 cum
Related Mcqs:
- While estimating a reinforced cement structure, the omitted cover of concrete is assumed_______________?
- A. At the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar B. In thin slabs, 12 mm minimum or diameter of the bar whichever is more C. For reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more D. … While estimating a reinforced cement structure, the omitted cover of concrete is assumed_______________?Read More...
- The cross -section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is__________________?
- A. b – rd)²/(r – s) B. b – rd)²/(r + s) C. ½ × (b + rd)²/(r – s) D. b – rd)²/(s – r)...
- Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds_________________?
- A. 2.0 % B. 2.5 % C. 4.0 % D. 5.0 %...
- The correct Prismoidal formula for volume is________________?
- A. D [first area + last area + Even area + 2 odd areas] B. D/3 [first area + last area + 4 Even area + 2 odd areas] C. D/3 [first area + last area + 2 Even area + 4 odd areas] D. D/6 [first area + odd areas]...
- Size, capacity and materials need be specified for__________________?
- A. Bib-cocks B. Stop-cocks C. Ball valves D. All the above...
Recent Comments