A. Specifications of works
B. Specifications of materials
C. Proportion of mortar
D. All the above
Related Mcqs:
- The rate of payment is made for 100 cu m (per % cu m) in case of__________________?
- A. Earth work in excavation B. Rock cutting C. Excavation in trenches for foundation D. All the above...
- As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken________________?
- A. 1.80 litres for 5 to 10 users B. 1.20 litres for 15 users C. 1.35 for 20 users D. All the above...
- The expected out turn of 12 mm plastering with cement mortar is_______________?
- A. 2.5 sq m B. 4.0 sq m C. 6.0 sq m D. 8.0 sq m...
- The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended___________________?
- A. 100 mm B. 150 mm C. 200 mm D. 175 mm...
- The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is____________________?
- A. 3250 m3 B. 3225 m3 C. 3275 m3 D. 3300 m3...
Recent Comments