Search
.Management Sciences
A. Area of the walls at the floor level
B. Internal shaft for sanitary installations up to 2 sq m. in area
C. Lift and wall including landing
D. Area of cantilevered porch
Related Mcqs:
- Pick up the correct statement regarding the centre line method of estimating a building?
- A. Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item B. The centre line is worked out separately for different sections of walls of a building C. The centre line length is reduced by half the layer of main wall joining the partition … Pick up the correct statement regarding the centre line method of estimating a building?Read More...
- As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken________________?
- A. 1.80 litres for 5 to 10 users B. 1.20 litres for 15 users C. 1.35 for 20 users D. All the above...
- The expected out turn of 12 mm plastering with cement mortar is_______________?
- A. 2.5 sq m B. 4.0 sq m C. 6.0 sq m D. 8.0 sq m...
- The correct Prismoidal formula for volume is________________?
- A. D [first area + last area + Even area + 2 odd areas] B. D/3 [first area + last area + 4 Even area + 2 odd areas] C. D/3 [first area + last area + 2 Even area + 4 odd areas] D. D/6 [first area + odd areas]...
- For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is___________________?
- A. 0.200 m3 B. 0.247 m3 C. 0.274 m3 D. 0.295 m3...