.Management Sciences
A. Detailed estimate
B. Preliminary estimate
C. Plinth area estimate
D. Cube rate estimate
Related Mcqs:
- While estimating a reinforced cement structure, the omitted cover of concrete is assumed_______________?
- A. At the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar B. In thin slabs, 12 mm minimum or diameter of the bar whichever is more C. For reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more D. … While estimating a reinforced cement structure, the omitted cover of concrete is assumed_______________?Read More...
- The cross -section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is__________________?
- A. b – rd)²/(r – s) B. b – rd)²/(r + s) C. ½ × (b + rd)²/(r – s) D. b – rd)²/(s – r)...
- The expected out turn of 2.5 cm cement concrete floor per mansion per day__________________?
- A. 2.5 sqm B. 5.0 sqm C. 7.5 sqm D. 10 sqm...
- Berms are provided in canals if these are__________________?
- A. Fully in excavation B. Partly in excavation and partly in embankment C. Fully in embankment D. All the above...
- The expected out turn of half brick partition wall per mason per day is___________________?
- A. 1.5 m 3 B. 2.0 m3 C. 4.0 m2 D. 5.0 m2...
Recent Comments