A. Reinforced brick work
B. Broken glass coping
C. Brick edging
D. Brick work in arches
Related Mcqs:
- Pick up the correct statement from the following?
- A. The estimated value of the work excluding the amount for contingencies, work charged establishment, tool and plants, is called work value B. The actual expenditure involved to complete a work including incidental, establishment and travelling charges, is called actual cost C. The formal acceptance by the administrative department for incurring an expenditure on the … Pick up the correct statement from the following?Read More...
- Cost of fittings and their fixing is specified for the following sanitary fittings________________?
- A. Water closets B. Flushing pipes C. Lavatory basins D. All the above...
- Pick up the excavation where measurements are made in square metres for payment ?
- A. Ordinary cuttings up to 1 m B. Surface dressing up to 15 cm depths C. Surface excavation up to 30 cm depths D. Both B. and C....
- The unit of measurement is per quintal for the following?
- A. Collapsible gates with rails B. Rolling shutters C. Expanded metal wire netting D. M.S. reinforcement of R.C.C. works...
- S: 1 and length is______________?
- A. d × d × s B. d2 × ( ds)2] C. L.D 1 + s2) D. 2 L.D 1 + s 2)...