Search
.Management Sciences
A. Setting out of works
B. Site clearance
C. Steps in deep excavation
D. All the above
Related Mcqs:
- Pick up the correct statement from the following?
- A. In order to check up the average depth of excavation, ‘Dead man s’ are left at the mid-widths of borrow pits B. The earthwork calculation in excavation is made from the difference in levels obtained with a level C. The earth work in excavation to form the road embankment includes the formation of correct … Pick up the correct statement from the following?Read More...
- The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is_______________?
- A. Rs. 400 B. Rs. 425 C. Rs. 450 D. Rs. 500...
- The expected out turn of 12 mm plastering with cement mortar is_______________?
- A. 2.5 sq m B. 4.0 sq m C. 6.0 sq m D. 8.0 sq m...
- 88 is 1400 kg/cm2 and bond stress is 6 kg/cm2, the If tensile stress of a steel rod of diameter required bond length of the rod is____________________?
- A. 30 D B. 39 D C. 50 D D. 59 D...
- Pick up the correct statement from the following?
- A. All pipes and fittings are classified according to their diameters B. The diameter of the pipes is the nominal diameter of internal bore C. All pipes are measured along the centre line of the pipes in metres D. All the above...
Recent Comments