A. 100 %
B. 75 %
C. 50 %
D. 25 %
Related Mcqs:
- The main factor to be considered while preparing a detailed estimate, is________________?
- A. Quantity of the materials B. Availability of materials C. Transportation of materials D. All the above...
- The following item of earth work is not measured separately ?
- A. Setting out of works B. Site clearance C. Steps in deep excavation D. All the above...
- The expected out turn of 2.5 cm cement concrete floor per mansion per day__________________?
- A. 2.5 sqm B. 5.0 sqm C. 7.5 sqm D. 10 sqm...
- Pick up the incorrect statement from the following?
- A. The built up covered area at the floor level of any storey of a building is called plinth area B. The usable covered area of the rooms of any storey of a building is called carpet area C. The carpet area of a building along with area of its kitchen, pantry, store, lavatory, bath … Pick up the incorrect statement from the following?Read More...
- For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is_______________?
- A. 0.90 m3 B. 0.94 m3 C. 0.98 m3 D. 1.00 m3...