.Management Sciences
A. Cub. m
B. Sq. m
C. Metres
D. None of these
Related Mcqs:
- A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is__________________?
- A. 500 m3 B. 1000 m 3 C. 1500 m3 D. 2000 m3...
- Pick up the correct statement from the following ?
- A. Pointing is measured in sq.m B. Plastering is measured in sq.m C. Glazing is measured in sq.m D. All the above...
- A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved ?
- A. 26,000 m3 B. 26,500 m3 C. 27,000 m3 D. 27,500 m3...
- The floor area includes the area of the balcony up to_________________?
- A. 100 % B. 75 % C. 50 % D. 25 %...
- Pick up the item whose weight is added to the weight of respective item, is________________?
- A. Cleats B. Brackets C. Bolts D. All the above...