A. Rs. 400
B. Rs. 425
C. Rs. 450
D. Rs. 500
Related Mcqs:
- The main factor to be considered while preparing a detailed estimate, is________________?
- A. Quantity of the materials B. Availability of materials C. Transportation of materials D. All the above...
- In the mid-section formula__________________?
- A. The mean depth is the average of depths of two consecutive sections B. The area of mid-sections is calculated by using mean depth C. The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections D. All of the above...
- In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and_________________?
- A. Breadth of the wall B. Half breadth of wall on each side C. One fourth breadth of wall on each side D. None of these...
- The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is__________________?
- A. (6 + 15) chains B. (6 + 12) chains C. (6 + 18) chains D. None of these...
- If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is___________________?
- A. B + d + Sd B. Bd + Sd2 C. B × d – Sd1/2 D. ½ (Bd + Sd2)...