Search
.Management Sciences
A. Circular buildings
B. Hexagonal buildings
C. Octagonal buildings
D. All the above
Related Mcqs:
- The main factor to be considered while preparing a detailed estimate, is________________?
- A. Quantity of the materials B. Availability of materials C. Transportation of materials D. All the above...
- Pick up the incorrect statement from the following?
- A. Lead is the average horizontal straight distance between the borrow pit and the place of spreading soil B. The lead is calculated for each block of the excavated area C. The unit of lead is 50 m for a distance upto 500 m D. The unit of lead is 1 km where the lead … Pick up the incorrect statement from the following?Read More...
- Pick up the excavation where measurements are made in square metres for payment ?
- A. Ordinary cuttings up to 1 m B. Surface dressing up to 15 cm depths C. Surface excavation up to 30 cm depths D. Both B. and C....
- Berms are provided in canals if these are__________________?
- A. Fully in excavation B. Partly in excavation and partly in embankment C. Fully in embankment D. All the above...
- Size, capacity and materials need be specified for__________________?
- A. Bib-cocks B. Stop-cocks C. Ball valves D. All the above...
Recent Comments