Search
.Management Sciences
A. 0.01 sqm
B. 0.02 sqm
C. 0.03 sqm
D. 0.04 sqm
Related Mcqs:
- In the mid-section formula__________________?
- A. The mean depth is the average of depths of two consecutive sections B. The area of mid-sections is calculated by using mean depth C. The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections D. All of the above...
- The trap which is provided to disconnect the house drain from the street sewer is called_________________?
- A. Master trap B. Intercepting trap C. Interception manhole D. All the above...
- The measurement is made for stone work in square metre in case of________________?
- A. Wall facing B. Columns, lintels, copings C. Building work D. A. and D. of the above...
- The item of steel work which is measured in sq.m, is_________________?
- A. Collapsible gates B. Rolling shutters C. Ventilators and glazing D. All the above...
- S: 1 and length is______________?
- A. d × d × s B. d2 × ( ds)2] C. L.D 1 + s2) D. 2 L.D 1 + s 2)...
Recent Comments