Search
.Management Sciences
A. Bib-cocks
B. Stop-cocks
C. Ball valves
D. All the above
Related Mcqs:
- While estimating the qualities for the construction of a building, the correct metric unit is________________?
- A. Metre for length B. Cubic metre for area C. Square metres for volume D. Litre for capacity...
- For the construction of buildings, the subheads of the estimate are________________?
- A. Earthwork, Concrete work, Brick work B. Brickwork, Stone work, Roofing C. Brickwork Flooring, Wood work, Steel work D. All the above...
- The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is__________________?
- A. (6 + 15) chains B. (6 + 12) chains C. (6 + 18) chains D. None of these...
- The correct Prismoidal formula for volume is________________?
- A. D [first area + last area + Even area + 2 odd areas] B. D/3 [first area + last area + 4 Even area + 2 odd areas] C. D/3 [first area + last area + 2 Even area + 4 odd areas] D. D/6 [first area + odd areas]...
- The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is ________________?
- A. 1.00 m3 B. 1.25 m3 C. 1.50 m3 D. 1.75 m3...
Recent Comments