.Management Sciences
A. d × d × s
B. d2 × ( ds)2]
C. L.D 1 + s2)
D. 2 L.D 1 + s 2)
Related Mcqs:
- The following item of earth work is not measured separately ?
- A. Setting out of works B. Site clearance C. Steps in deep excavation D. All the above...
- Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds_________________?
- A. 2.0 % B. 2.5 % C. 4.0 % D. 5.0 %...
- The expected out turn of 2.5 cm cement concrete floor per mansion per day__________________?
- A. 2.5 sqm B. 5.0 sqm C. 7.5 sqm D. 10 sqm...
- The order of booking dimensions is________________?
- A. Length, breadth, height B. Breadth, length, height C. Height, breadth, length D. None of these...
- The expected out turn of half brick partition wall per mason per day is___________________?
- A. 1.5 m 3 B. 2.0 m3 C. 4.0 m2 D. 5.0 m2...