Search
.Management Sciences
A. Lead is the average horizontal straight distance between the borrow pit and the place of spreading soil
B. The lead is calculated for each block of the excavated area
C. The unit of lead is 50 m for a distance upto 500 m
D. The unit of lead is 1 km where the lead exceeds 2 km
Related Mcqs:
- The assumption on which the trapezoidal formula for volumes is based, is________________?
- A. The end sections are parallel planes B. The mid-area of a pyramid is half the average area of the ends C. The volume of the Prismoidal is over-estimated and hence a Prismoidal correction is applied D. All the above...
- The rate of payment is made for 100 cu m (per % cu m) in case of__________________?
- A. Earth work in excavation B. Rock cutting C. Excavation in trenches for foundation D. All the above...
- The area is measured correct to the nearest___________________?
- A. 0.01 sqm B. 0.02 sqm C. 0.03 sqm D. 0.04 sqm...
- Pick up the incorrect statement from the following?
- A. Dimensions are measured to the nearest 0.01 m B. Areas are measured to the nearest 0.01 sq.m C. Cubic contents are measured to the nearest 0.1 cum D. Weights are measured to the nearest 0.001 tonnes...
- Size, capacity and materials need be specified for__________________?
- A. Bib-cocks B. Stop-cocks C. Ball valves D. All the above...