A. Pipes laid in trenches and pipes fixed to walls are measured separately
B. Cutting through walls and floors are included with the item
C. Pipes are classified according to their sizes and quality
D. All the above
Related Mcqs:
- The cross -sections for a highway is taken at_________________?
- A. Right angle to the centre line B. 30 metres apart C. Intermediate points having abrupt change in gradient D. All the above...
- In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and_________________?
- A. Breadth of the wall B. Half breadth of wall on each side C. One fourth breadth of wall on each side D. None of these...
- Anti-siphonage pipe is connected to__________________?
- A. Main soil pipe B. Bottom of P trap W.C. C. Top of P trap W.C. D. Side of water closet...
- The floor area includes the area of the balcony up to_________________?
- A. 100 % B. 75 % C. 50 % D. 25 %...
- The expected out turn of half brick partition wall per mason per day is___________________?
- A. 1.5 m 3 B. 2.0 m3 C. 4.0 m2 D. 5.0 m2...
Recent Comments