Search
.Management Sciences
A. The incidental expenses of a miscellaneous character which could not be predicted during preparation of the estimate, is called contingencies
B. Additional supervising staff engaged at work site, is called work charged establishment
C. Detailed specifications specify qualities, quantities and the proportions of materials to be used for a particular item
D. All the above
Related Mcqs:
- The brick work is not measured in cu m in case of_______________?
- A. One or more than one brick wall B. Brick work in arches C. Reinforced brick work D. Half brick wall...
- Pick up the incorrect statement from the following ?
- A. No deduction is made for the volume occupied by reinforcement B. No deduction is made for the openings upto 0.1 sq.m C. No deduction is made for volumes occupied by pipes, not exceeding 100 sq.cm in cross-section D. None of these...
- Pick up the correct statement from the following?
- A. Bricks are paid per thousand B. Cement is paid per 50 kg bag C. Lime is paid per quintal D. All the above...
- Size, capacity and materials need be specified for__________________?
- A. Bib-cocks B. Stop-cocks C. Ball valves D. All the above...
- Pick up the correct statement from the following?
- A. All pipes and fittings are classified according to their diameters B. The diameter of the pipes is the nominal diameter of internal bore C. All pipes are measured along the centre line of the pipes in metres D. All the above...
Recent Comments