A. The earth work of cutting in trenches or borrow pits in fairly uniform ground is measured with the help of average depths of the dead men
B. The earth work in trenches or borrow pits in irregular ground is measured by taking the difference in levels before and after completion of work
C. The earth work in trenches or borrow pits, where neither a nor b is feasible, are measured from the fillings after deduction of voids
D. All the above
Related Mcqs:
- The main factor to be considered while preparing a detailed estimate, is________________?
- A. Quantity of the materials B. Availability of materials C. Transportation of materials D. All the above...
- Cost of fittings and their fixing is specified for the following sanitary fittings________________?
- A. Water closets B. Flushing pipes C. Lavatory basins D. All the above...
- Anti-siphonage pipe is connected to__________________?
- A. Main soil pipe B. Bottom of P trap W.C. C. Top of P trap W.C. D. Side of water closet...
- Pick up the incorrect statement from the following?
- A. Dimensions are measured to the nearest 0.01 m B. Areas are measured to the nearest 0.01 sq.m C. Cubic contents are measured to the nearest 0.1 cum D. Weights are measured to the nearest 0.001 tonnes...
- For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is___________________?
- A. 0.200 m3 B. 0.247 m3 C. 0.274 m3 D. 0.295 m3...
Recent Comments