A. The estimated value of the work excluding the amount for contingencies, work charged establishment, tool and plants, is called work value
B. The actual expenditure involved to complete a work including incidental, establishment and travelling charges, is called actual cost
C. The formal acceptance by the administrative department for incurring an expenditure on the work, is called administrative approval
D. All the above
Related Mcqs:
- Pick up the correct statement from the following?
- A. In order to check up the average depth of excavation, ‘Dead man s’ are left at the mid-widths of borrow pits B. The earthwork calculation in excavation is made from the difference in levels obtained with a level C. The earth work in excavation to form the road embankment includes the formation of correct … Pick up the correct statement from the following?Read More...
- The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is_______________?
- A. Rs. 400 B. Rs. 425 C. Rs. 450 D. Rs. 500...
- The measurement is made for stone work in square metre in case of________________?
- A. Wall facing B. Columns, lintels, copings C. Building work D. A. and D. of the above...
- The item of steel work which is measured in sq.m, is_________________?
- A. Collapsible gates B. Rolling shutters C. Ventilators and glazing D. All the above...
- Pick up the correct statement from the following?
- A. All pipes and fittings are classified according to their diameters B. The diameter of the pipes is the nominal diameter of internal bore C. All pipes are measured along the centre line of the pipes in metres D. All the above...
Recent Comments