.Management Sciences
A. B + d + Sd
B. Bd + Sd2
C. B × d – Sd1/2
D. ½ (Bd + Sd2)
Related Mcqs:
- The main factor to be considered while preparing a detailed estimate, is________________?
- A. Quantity of the materials B. Availability of materials C. Transportation of materials D. All the above...
- The following item of earth work is not measured separately ?
- A. Setting out of works B. Site clearance C. Steps in deep excavation D. All the above...
- The expected out turn of 2.5 cm cement concrete floor per mansion per day__________________?
- A. 2.5 sqm B. 5.0 sqm C. 7.5 sqm D. 10 sqm...
- The order of booking dimensions is________________?
- A. Length, breadth, height B. Breadth, length, height C. Height, breadth, length D. None of these...
- For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is_______________?
- A. 0.90 m3 B. 0.94 m3 C. 0.98 m3 D. 1.00 m3...