Search
.Management Sciences
A. Earthwork, Concrete work, Brick work
B. Brickwork, Stone work, Roofing
C. Brickwork Flooring, Wood work, Steel work
D. All the above
Related Mcqs:
- While estimating the qualities for the construction of a building, the correct metric unit is________________?
- A. Metre for length B. Cubic metre for area C. Square metres for volume D. Litre for capacity...
- If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by_______________?
- A. Mid-section formula B. Trapezoidal formula C. Prismoidal formula D. All the above...
- Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds_________________?
- A. 2.0 % B. 2.5 % C. 4.0 % D. 5.0 %...
- The total length of a cranked bar through a distance D. at 45° in case of a beam of effective length L, is_________________?
- A. L + 0.42 d B. L + (2 × 0.42 d) C. L – (0.42 d) D. L – (2 × 0.4 d)...
- Pick up the item of work not included in the plinth area estimate______________?
- A. Wall thickness B. Room area C. W.C. area D. Courtyard area...
Recent Comments