A. 1.80 litres for 5 to 10 users
B. 1.20 litres for 15 users
C. 1.35 for 20 users
D. All the above
Related Mcqs:
- The main factor to be considered while preparing a detailed estimate, is________________?
- A. Quantity of the materials B. Availability of materials C. Transportation of materials D. All the above...
- Pick up the incorrect statement from the following?
- A. Lead is the average horizontal straight distance between the borrow pit and the place of spreading soil B. The lead is calculated for each block of the excavated area C. The unit of lead is 50 m for a distance upto 500 m D. The unit of lead is 1 km where the lead … Pick up the incorrect statement from the following?Read More...
- The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is_______________?
- A. Rs. 400 B. Rs. 425 C. Rs. 450 D. Rs. 500...
- A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved ?
- A. 26,000 m3 B. 26,500 m3 C. 27,000 m3 D. 27,500 m3...
- The brick work is measured in sq metre, in case of_________________?
- A. Honey comb brick work B. Brick flat soling C. Half brick walls or the partition D. All the above...