A. The progress of work in low level method of mound construction is very slow.
B. Barge method of mound construction is economical.
C. In low level method of mound construction, the area of working is limited.
D. In staging method of mound cons-truction, the work is not interrupted even during stormy weather
Related Mcqs:
- Which of the following is a fixed type mooring accessory ?
- A. bollard B. buoys C. cables D. anchors...
- Which of the following structures are constructed parallel to shore line to develop a demarcating line between land area and water area ?
- A. sea walls, bulk heads and groynes B. sea walls, bulk heads and revetments C. sea walls, revetments and groynes D. bulk heads, revetments and groynes...
- If H is the height of the wave expected, then the height of the breakwater is generally taken as______________________?
- A. 1.2 H to 1.25 H above the datum B. 1.2 H to 1.25 H above the low water level C. 1.2 H to 1.25 H above the high water level D. 1.2 H to 1.25 H above the mean sea level...
- In a two lane channel, bottom width of channel is given by_______________?
- A. Manoeuvring lane + 2 x Bank clearance lane B. 2 x Manoeuvring lane + 2 x Bank clearance lane C. 2 x Manoeuvring lane + 2 x Bank clearance lane + ship clearance lane D. Manoeuvring lane + 2 x Bank clearance lane + ship clearance lane...
- As per Berlin’s formula, the length of wave in metres is given by_______________?
- A. 1.3412 B. 1.5612 C. 1.7412 D. 1.9412 where ‘t’ is the period in seconds for two successive waves to pass the same section...
Recent Comments