A. Manoeuvring lane + 2 x Bank clearance lane
B. 2 x Manoeuvring lane + 2 x Bank clearance lane
C. 2 x Manoeuvring lane + 2 x Bank clearance lane + ship clearance lane
D. Manoeuvring lane + 2 x Bank clearance lane + ship clearance lane
Related Mcqs:
- As compared to wall type breakwater, mound type breakwater_________________?
- A. requires skilled labour B. requires low maintenance cost C. requires less material D. results in less damage due to gradual failure...
- Which of the following is a fixed type mooring accessory ?
- A. bollard B. buoys C. cables D. anchors...
- Which of the following structures are constructed parallel to shore line to develop a demarcating line between land area and water area ?
- A. sea walls, bulk heads and groynes B. sea walls, bulk heads and revetments C. sea walls, revetments and groynes D. bulk heads, revetments and groynes...
- If H is the height of the wave expected, then the height of the breakwater is generally taken as______________________?
- A. 1.2 H to 1.25 H above the datum B. 1.2 H to 1.25 H above the low water level C. 1.2 H to 1.25 H above the high water level D. 1.2 H to 1.25 H above the mean sea level...
- Select the incorrect statement ?
- A. The progress of work in low level method of mound construction is very slow. B. Barge method of mound construction is economical. C. In low level method of mound construction, the area of working is limited. D. In staging method of mound cons-truction, the work is not interrupted even during stormy weather...