A. less than 1
B. between 1 and 1.5
C. between 1.5 and 2
D. greater than 2
Related Mcqs:
- Workability of concrete is directly proportional to________________?
- A. aggregate cement ratio B. time of transit C. grading of the aggregate D. all of above...
- For concreting of heavily reinforced sections without vibration, the workability of concrete expressed as compacting factor should be________________?
- A. 0.75-0.80 B. 0.80-0.85 C. 0.85 – 0.92 D. above 0.92...
- If the size of panel in a flat slab is 6m x 6m, then as per Indian Standard Code, the widths of column strip and middle strip are__________________?
- A. 3.0 m and 1.5 m B. 1.5 m and 3.0 m C. 3.0 m and 3.0 m D. 1.5 m and 1.5 m...
- The load factors for live load and dead load are taken respectively as_________________?
- A. 1.5 and 2.2 B. 2.2 and 1.5 C. 1.5 and 1.5 D. 2.2 and 2.2...
- The main reinforcement in the toe of a T- shaped R C. retaining wall is provided on_______________?
- 1. top face parallel to the wall 2. top face perpendicular to the wall 3. bottom face paralleUo the wall 4. bottom face perpendicular to the wall The correct answer is ? A. only (2) is correct B. (1) and (2)are correct C. (3) and (4) are correct D. only (4) is correct...