Search
.Management Sciences
A. 25%
B. 40%
C. 60%
D. 80%
Related Mcqs:
- The compressive strength of 100 mm cube as compared to 150 mm cube is always_______________?
- A. less B. more C. equal D. none of the above...
- For walls, columns and vertical faces of all structural members, the form work is generally removed after_______________?
- A. 24 to 48 hours B. 3 days C. 7 days D. 14 days...
- Ratio of permissible stress in direct compression and bending compression is______________?
- A. less than 1 B. between 1 and 1.5 C. between 1.5 and 2.0 D. greater than 2...
- The centroid of compressive force, from the extreme compression fiber, in limit state design lies at a distance of__________________?
- A. 0.367 xu B. 0.416 xu C. 0.446 xu D. 0.573 xu where xu is the depth of neutral axis at the limit state of collapse...
- The purpose of reinforcement in prestressed concrete is________________?
- A. to provide adequate bond stress B. to resist tensile stresses C. to impart initial compressive stress in concrete D. all of the above...
Recent Comments