Search
.Management Sciences
A. M15
B. M20
C. M 10
D. M25
Related Mcqs:
- According to IS : 456 -1978, the modulus of elasticity of concrete Ec (in N/mm2) can be taken as______________?
- A. Ec = = 5700 B. Ec = = 570 C. Ec = = 5700fck D. Ec = where fck N/mm2 = 700 is the characteristic strength in...
- The slab is designed as one way if the ratio of long span to short span is_____________?
- A. less than 1 B. between 1 and 1.5 C. between 1.5 and 2 D. greater than 2...
- The temperature reinforcement in the vertical slab of a T-shaped R.C. retaining wall is______________?
- A. not needed B. provided equally on inner and front faces C. provided more on inner face than on front face D. provided more on front face than on inner face...
- In a spherical dome subjected to concentrated load at crown or uniformly distributed load, the meridional force is always________________?
- A. zero B. tensile C. compressive D. tensile or compressive...
- Select the incorrect statement?
- A. The loss of prestress is more in pre-tensioning system than in post-tensioning system. B. Pretensioning system has greater certainty about its durability. C. For heavy loads and large spans in buildings or bridges, post-tensioning system is cheaper than pretensioning system D. none of the above...
Recent Comments