Search
.Management Sciences
A. 600 mm
B. 750 mm
C. 900 mm
D. more than 1 m
Related Mcqs:
- Admixtures which cause early setting, and hardening of concrete are called_______________?
- A. workability admixtures B. accelerators C. retarders D. air entraining agents...
- For concreting of heavily reinforced sections without vibration, the workability of concrete expressed as compacting factor should be________________?
- A. 0.75-0.80 B. 0.80-0.85 C. 0.85 – 0.92 D. above 0.92...
- The average permissible stress in bond for plain bars in tension is_______________?
- A. increased by 10% for bars in compression B. increased by 25% for bars in compression C. decreased by 10% for bars in compression D. decreased by 25% for bars in compression...
- If nominal shear stress tv exceeds the design shear strength of concrete xc, the nominal shear reinforcement as per IS : 456-1978 shall be provided for carrying a shear stress equal to__________________?
- A. xv B. xc C. xv – TC D. Tv + Tc...
- Normally prestressing wires are arranged in the_______________?
- A. upper part of the beam B. lower part of the beam C. center D. anywhere...
Recent Comments