.Management Sciences
A. interdependencies of activities
B. project progress
C. uncertainties
D. all of the above
Related Mcqs:
- Which of the following is not a PERT event ?
- A. site investigation started B. sessional work completed C. bus starts from Jaipur D. class is being attended...
- The time by which a particular activity can be delayed without affecting the preceding and succeeding activities is known as_______________?
- A. total float B. free float C. interfering float D. independent float...
- In the critical path method of construction planning, Free Float can be_____________?
- Consider the following statements ? 1. greater than Total Float. 2. greater than Independent Float 3. equal to Total Float. 4. less than Independent Float. Of these statements A. 1 and 4 are correct B. 2 and 3 are correct C. 1 and 4 are correct D. 1 and 2 are correct...
- In the time-cost optimisation, using CPM method for network analysis, the crashing of the activities along the critical path is done starting with the activity having________________?
- A. longest duration B. highest cost slope C. least cost slope D. shortest duration...
- Which one of the following surfaces will give highest coefficient of traction while using crawler track tractors?
- A. Ice B. Concrete C. Loose sand D. Earth...