Search
.Management Sciences
A. free float of the activity must be zero but independent float need not be zero
B. independent float must be zero but free float need not be zero
C. free float and independent float both must be zero
D. free float and independent float both need not be zero
Related Mcqs:
- Which of the following does not represent an activity?
- A. site located B. foundation is being dug C. the office area is being cleaned D. the invitations are being sent...
- A machine is purchased for Rs. 10,000,00/- and has an estimated life of 10 years. The salvage value at the end of 10 years is Rs. 1,50,000/-. The book value of the machine at the end of 5 years using general straight line method of evaluation of depreciation is__________________?
- A. Rs. 4,75,000/- B. Rs. 5,75,000/- C. Rs. 6,50,000/- D. Rs. 8,50,000/-...
- In the time-cost optimisation, using CPM method for network analysis, the crashing of the activities along the critical path is done starting with the activity having________________?
- A. longest duration B. highest cost slope C. least cost slope D. shortest duration...
- The constraints in case of resource smoothening operation would be_______________?
- A. resources B. project duration time C. both resources and project duration time D. none of the above...
- In PERT analysis, the time estimates of activities and probability of their occurrence follow_______________?
- A. normal distribution curve B. Poisson’s distribution curve C. Beta – distribution curve D. none of the above...