A. the fund for rebuilding a structure when its economic life is over
B. raised to meet maintenance costs
C. the total sum to be paid to the municipal authorities by the tenants
D. a part of the money kept in reserve for providing additional structures and structural modifications
Related Mcqs:
- Which of the following is not a PERT event ?
- A. site investigation started B. sessional work completed C. bus starts from Jaipur D. class is being attended...
- Consider the following statements for a power shovel?
- (i) Output can be increased by reducing the angle of swing for a given depth of cut (ii) For a given angle of swing, output will be maximum at optimum depth of cut (iii) Output can be increased by keeping the depth of cut less than optimum depth (iv) Output can be increased by increasing … Consider the following statements for a power shovel?Read More...
- In the time-cost optimisation, using CPM method for network analysis, the crashing of the activities along the critical path is done starting with the activity having________________?
- A. longest duration B. highest cost slope C. least cost slope D. shortest duration...
- The constraints in case of resource smoothening operation would be_______________?
- A. resources B. project duration time C. both resources and project duration time D. none of the above...
- PERT technique of network analysis is mainly useful for__________________?
- A. small projects B. large and complex projects C. research and development projects D. deterministic activities...
Recent Comments