A. Activity arrows in a CPM network are drawn to scale
B. The tail of an arrow represents the finish of an activity
C. Arrow bead represents the start of an activity
D. none of the above
Related Mcqs:
- Which of the following is not a PERT event ?
- A. site investigation started B. sessional work completed C. bus starts from Jaipur D. class is being attended...
- Consider the following statements for a power shovel?
- (i) Output can be increased by reducing the angle of swing for a given depth of cut (ii) For a given angle of swing, output will be maximum at optimum depth of cut (iii) Output can be increased by keeping the depth of cut less than optimum depth (iv) Output can be increased by increasing … Consider the following statements for a power shovel?Read More...
- The rated loads of lifting cranes, as percentage of tipping load at specified radius, for crawler-mounted, and pneumatic tyremounted machines would be respectively_________________?
- A. 80 and 90 B. 90 and 80 C. 85 and 75 D. 75 and 83...
- Crash project duration is obtained by summing the________________?
- A. normal durations for all the activities B. crash durations for all activities C. crash durations for all the activities along the critical path obtained by taking into account the normal duration for all the activities D. crash durations for all the activities along the critical path obtained by taking into account the crash duration … Crash project duration is obtained by summing the________________?Read More...
- In PERT analysis, the time estimates of activities and probability of their occurrence follow_______________?
- A. normal distribution curve B. Poisson’s distribution curve C. Beta – distribution curve D. none of the above...