Search
.Management Sciences
A. total float and free float
B. total float and independent float
C. free float and independent float
D. none of the above
Related Mcqs:
- If the optimistic time, most likely time and pessimistic time for activity A are 4, 6 and 8 respectively and for activity B are 5, 5.5 and 9 respectively, then______________?
- A. expected time of activity A is greater than the expected time of activity B B. expected time of activity B is greater than the expected time of activity A C. expected time of both activities A and B are same D. none of the above...
- A tractor shovel has a purchase price of Rs. 4.7 lacs and could save the organization an amount of rupees one lac per year on operating costs. The salvage value after the amortization period is 10% of the purchase price. The capital recovery period will be________________?
- A. 3.7 years B. 4.23 years C. 5 years D. 7.87 years...
- The rated loads of lifting cranes, as percentage of tipping load at specified radius, for crawler-mounted, and pneumatic tyremounted machines would be respectively_________________?
- A. 80 and 90 B. 90 and 80 C. 85 and 75 D. 75 and 83...
- Which one of the following surfaces will give highest coefficient of traction while using crawler track tractors?
- A. Ice B. Concrete C. Loose sand D. Earth...
- What estimate would you give for the variance in above problem ?
- A. 81 B. 54 C. 36 D. 9...
Recent Comments