A. on all the activities
B. on all the activities lying on the critical path
C. only on activities lying on the orginal critical path and having flatter cost slopes
D. on original critical activities and those that become critical at any stage of crashing in the order of ascending cost slope
Related Mcqs:
- The time corresponding to minimum total project cost is_______________?
- A. crash time B. normal time C. optimistic time D. between normal time and crash time...
- If the excavation of earth is done manually then it costs Rs. 10 per cum. A machine can excavate at a fixed cost of Rs. 4000 plus a variable cost of Rs. 2 per cum. The quantity of earth for which the cost of excavation by machine will be equal to the cost of manual excavation is_________________?
- A. 500 cum B. 1000 cum C. 1500 cum D. 2000 cum...
- The correct sequence of these operations in tunnel construction is______________?
- Consider the following operations : 1. Drilling 2. Blasting 3. Mucking 4. Placing steel 5. Placing concrete A. 1,2,4,3,5 B. 1,3,2,4,5 C. 1,2,3,4,5 D. 1,3,4,2,5...
- A four wheel trac*or whose operating weight is 12000 kg is pulled along a road having a rising slope of 2% at a uniform speed. Assume grade resistance factor = 10 kg/tonne. The tension in the tow cable is 720 kg. The rolling resistance of the road will be___________________?
- A. 20 kg/tonne B. 30 kg/tonne C. 40 kg/tonne D. 50 kg/tonne...
- Economic saving of time results by crashing_________________?
- A. cheapest critical activity B. cheapest non-critical activity C. costliest critical activity D. costliest non-critical activity...
Recent Comments