A. Moist loam
B. Sand and gravel
C. Good common earth
D. Wet sticky clay
Related Mcqs:
- If the optimistic time, most likely time and pessimistic time for activity A are 4, 6 and 8 respectively and for activity B are 5, 5.5 and 9 respectively, then______________?
- A. expected time of activity A is greater than the expected time of activity B B. expected time of activity B is greater than the expected time of activity A C. expected time of both activities A and B are same D. none of the above...
- In resources levelling________________?
- A. total duration of project is reduced B. total duration of project is increased C. uniform demand of resources is achieved D. cost of project is controlled...
- Grader is used mainly for___________________?
- A. trimming and finishing B. shaping and trimming C. finishing and shaping D. finishing, shaping and trimming...
- Economic saving of time results by crashing_________________?
- A. cheapest critical activity B. cheapest non-critical activity C. costliest critical activity D. costliest non-critical activity...
- PERT technique of network analysis is mainly useful for__________________?
- A. small projects B. large and complex projects C. research and development projects D. deterministic activities...