A. increase in rates of only important materials
B. variation in cost in materials element, labour element and petrol-oil-lubricant element
C. variation in total cost of the project on an ad hoc basis
D. rate of inflation
Related Mcqs:
- A tractor whose weight is 20 tonnes has a drawbar pull of 2500 kg, when operated on a level road having a rolling resistence of 30 kg per tonne. If this tractor is operated on a level road having a rolling resistance of 40 kg per tonne, then the drawbar pull of the tractor will________________?
- A. reduce by 200 kg B. increase by 200 kg C. increase by 250 kg D. reduce by 250 kg...
- Sinking fund is_______________?
- A. the fund for rebuilding a structure when its economic life is over B. raised to meet maintenance costs C. the total sum to be paid to the municipal authorities by the tenants D. a part of the money kept in reserve for providing additional structures and structural modifications...
- Preliminary project report for a road project must contain___________________?
- A. the detailed estimated cost based on detailed design B. the several alternatives of the project that have been considered C. the soil survey, traffic survey, concept design and approximate cost D. the contract documents for inviting tenders...
- If the scheduled completion time of a project is more than the earliest expected time for completion of the project, then the probability of completion of the project within the scheduled completion time will be__________________?
- A. 50% B. less than 50% C. more than 50% D. 100%...
- Select the correct statement?
- A. Activity arrows in a CPM network are drawn to scale B. The tail of an arrow represents the finish of an activity C. Arrow bead represents the start of an activity D. none of the above...