.Management Sciences
A. is always longest
B. is always shortest
C. may be longest
D. may be shortest
Related Mcqs:
- A father notes that when his teenage daughter uses the telephone, she takes not less than 6 minutes for a call and som? times as much as an hour. Fifteen minutes call are more frequent than calls of any other duration. If these phone calls were an activity in PERT project, then phone calls expected duration will be_______________?
- A. 15 minutes B. 20.143 minutes C. 21 minutes D. 27 minutes...
- A tractor shovel has a purchase price of Rs. 4.7 lacs and could save the organization an amount of rupees one lac per year on operating costs. The salvage value after the amortization period is 10% of the purchase price. The capital recovery period will be________________?
- A. 3.7 years B. 4.23 years C. 5 years D. 7.87 years...
- The rated loads of lifting cranes, as percentage of tipping load at specified radius, for crawler-mounted, and pneumatic tyremounted machines would be respectively_________________?
- A. 80 and 90 B. 90 and 80 C. 85 and 75 D. 75 and 83...
- The grade resistance factor for an earth moving machine can be obtained by multiplying grade percentage by a factor approximately equal to_________________?
- A. 2 kg/tonne B. 6 kg/tonne C. 9 kg/tonne D. 20 kg/tonne...
- The independent float affects only_______________?
- A. preceding activities B. succeeding activities C. the particular activity involved D. none of the above...