(i) Output can be increased by reducing the angle of swing for a given depth of cut
(ii) For a given angle of swing, output will be maximum at optimum depth of cut
(iii) Output can be increased by keeping the depth of cut less than optimum depth
(iv) Output can be increased by increasing the size of shovel
select the correct statements?
A. (ii), (iii) and (iv) are correct
B. (i), (ii) and (iv) are correct
C. (i), (iii) and (iv) are correct
D. (i) and (iv) are correct
Related Mcqs:
- Which of the following is a weakness of bar chart ?
- A. interdependencies of activities B. project progress C. uncertainties D. all of the above...
- A machine is purchased for Rs. 10,000,00/- and has an estimated life of 10 years. The salvage value at the end of 10 years is Rs. 1,50,000/-. The book value of the machine at the end of 5 years using general straight line method of evaluation of depreciation is__________________?
- A. Rs. 4,75,000/- B. Rs. 5,75,000/- C. Rs. 6,50,000/- D. Rs. 8,50,000/-...
- In the time-cost optimisation, using CPM method for network analysis, the crashing of the activities along the critical path is done starting with the activity having________________?
- A. longest duration B. highest cost slope C. least cost slope D. shortest duration...
- In the bar chart planning____________?
- Consider the following statements? 1. interdependence of the operations cannot be portrayed 2. progress of work can be measured 3. spare time of the activities can be determined 4. schedule cannot be updated A. 1,2 and 3 are correct B. 1 and 4 are correct C. 2, 3 and 4 are correct D. 1,2 and … In the bar chart planning____________?Read More...
- The constraints in case of resource smoothening operation would be_______________?
- A. resources B. project duration time C. both resources and project duration time D. none of the above...