A. reduce by 200 kg
B. increase by 200 kg
C. increase by 250 kg
D. reduce by 250 kg
Related Mcqs:
- Which of the following is not a PERT event ?
- A. site investigation started B. sessional work completed C. bus starts from Jaipur D. class is being attended...
- If the excavation of earth is done manually then it costs Rs. 10 per cum. A machine can excavate at a fixed cost of Rs. 4000 plus a variable cost of Rs. 2 per cum. The quantity of earth for which the cost of excavation by machine will be equal to the cost of manual excavation is_________________?
- A. 500 cum B. 1000 cum C. 1500 cum D. 2000 cum...
- In the time-cost optimisation, using CPM method for network analysis, the crashing of the activities along the critical path is done starting with the activity having________________?
- A. longest duration B. highest cost slope C. least cost slope D. shortest duration...
- A machine costs Rs. 20000 and its useful life is 8 years. The money is borrowed at 8% interest per annum. The capital recovery factor at 8% interest per annum for 8 years is 0.174. The annual equipment cost of the machine will be________________?
- A. Rs.1740 B. Rs.3480 C. Rs.5220 D. Rs.6960...
- PERT technique of network analysis is mainly useful for__________________?
- A. small projects B. large and complex projects C. research and development projects D. deterministic activities...