.Management Sciences
A. Rs. 4,75,000/-
B. Rs. 5,75,000/-
C. Rs. 6,50,000/-
D. Rs. 8,50,000/-
Related Mcqs:
- Which of the following excavators is most suitable for digging under water?
- A. Drag line B. Hoe C. Clam shell D. Dipper shovel...
- The rated loads of lifting cranes, as percentage of tipping load at specified radius, for crawler-mounted, and pneumatic tyremounted machines would be respectively_________________?
- A. 80 and 90 B. 90 and 80 C. 85 and 75 D. 75 and 83...
- At a work site, statistical quality control of concrete means________________?
- A. measurement of risks to eliminate failures B. applying the theory’ of probability to sample testing or inspection C. reduction in wastage of inspection costs D. reduction in costs for the removal of defects...
- Crash project duration is obtained by summing the________________?
- A. normal durations for all the activities B. crash durations for all activities C. crash durations for all the activities along the critical path obtained by taking into account the normal duration for all the activities D. crash durations for all the activities along the critical path obtained by taking into account the crash duration … Crash project duration is obtained by summing the________________?Read More...
- In PERT analysis, the time estimates of activities and probability of their occurrence follow_______________?
- A. normal distribution curve B. Poisson’s distribution curve C. Beta – distribution curve D. none of the above...