Search
.Management Sciences
A. Pug
B. Cohesive
C. Seal
D. Repair
Related Mcqs:
- The process of consolidation of stabilized earth work in canal or river embankments. In this process the soil is deposited in layers of specified thickness and at a particular moisture content is called __________________?
- A. Soil stabilization B. Densification C. Compaction D. All are correct...
- Theoretical velocity of the jet at Vena Contracta is determined by ________________?
- A. (2 gh)1/2 B. 2(gh)1/2 C. 2g (h)1/2 D. 2gh...
- The discharge through rectangular channel is maximum when Hydraulic mean depth m is equal to ______________?
- A. depth/ 3 B. depth/ 2 C. depth/ 4 D. 2 / 3 depth...
- The loss of head H/ L is proportional to the length of creep. There fore the loss of head per unit creep length is called ______________________?
- A. Hydraulic gradient B. Head loss C. Creep length D. Exit gradient...
- If a river or stream is collecting sediment and is building up dunes in its bed is called ______________________?
- A. Stable river B. Sub-stable river C. Aggrading river D. Sediment river...
Recent Comments