Search
.Management Sciences
A. River controlling works
B. River Training works
C. Marginal Embankment
D. Guide Banks
Related Mcqs:
- The fixing of points in such away or the ground to have a correct lines for setting a canal or water course is called _________________?
- A. Lining of canal B. Alignment of canal C. Designing of canal D. All are correct...
- A type of flow in which water particles, while moving in the direction of flow, rotate about their mass centre is called _________________?
- A. Turbulent flow B. Laminar flow C. Rotational flow D. Circular flow...
- generally useful life of a reservoir is considered terminated when its -gross storage is reduced by _______________ of the design capacity of the reservoir?
- A. 100% B. 80% C. 50% l D. 20%...
- A unit hydrograph is a hydrograph of runoff produced by a rainstorm of a specified duration called ____________________?
- A. Unit duration B. Peak runoff C. Storm runoff D. Base flow...
- The depth before the jump is always less then the depth after the jump. The depth before the jump is called initial depth and depth after the jump is called_______________?
- A. Afflux B. Final depth C. Sequent depth D. Down stream water depth...
Recent Comments