Search
.Management Sciences
A. 1.3
B. 1.4
C. 1.5
D. 1.6
Related Mcqs:
- The fixing of points in such away or the ground to have a correct lines for setting a canal or water course is called _________________?
- A. Lining of canal B. Alignment of canal C. Designing of canal D. All are correct...
- The process of consolidation of stabilized earth work in canal or river embankments. In this process the soil is deposited in layers of specified thickness and at a particular moisture content is called __________________?
- A. Soil stabilization B. Densification C. Compaction D. All are correct...
- A plot of graphical representation showing river flow against time is called _____________________?
- A. Monograph B. Hyetograph C. Hydrograph D. All are correct...
- The down stream sloping glacis of the Hydraulic structure is made in such a way to form automatically the _____________ and dissipate the surplus energy of flowing water?
- A. Afflux B. Hydraulic jump C. Pond level D. HFL...
- If the weir flood is designed continuous with divide piers as reinforced structure,such that the weight of divide piers, keep the structure safe against uplift, is called__________________?
- A. Non-gravity weir B. Gravity weir C. Sharp crested weir D. Rectangular weir...
Recent Comments