Search
.Management Sciences
A spoil bank is formed when the volume of excavated soil is _________________ of embankment filling?
A. Less than
B. Excess
C. Equal to
D. Not required
Related Mcqs:
- To dispose of the surplus water from dam, a water way is constructed called________________?
- A. Water escape B. Spillway C. Channel D. All are correct...
- When the reservoir is full, the maximum compressive force in a gravity dam is produced ___________________?
- A. At the toe B. At the heel C. Within the middle third of base D. At centre of base...
- Wilting point is that limit after that the crop starts feeding up and no water is available for plant, this point occurs after _________________?
- A. 30% water available B. 25% water available C. 20% water available D. All are correct...
- The centre of pressure of a plane submerged area which holds it in equilibrium is ____________________?
- A. Always below the centre of gravity of the area B. Coincident with centroid of area if its plane is vertical C. Always above the centroid of the area D. Independent of the inclination of area...
- When seepage water after passing the ground water aquifer joins the surface stream, such stream will be called_____________________?
- A. Influent stream B. Effluent stream C. Rain stream D. Storm stream...
Recent Comments