A. Software Project Manager’s Plan
B. Software Project Management Plan
C. Software Product Management Plan
D. Software Product Manager’s Plan
Explanation: After planning is complete, documenting of the plans is done in a Software Project Management Plan(SPMP) document.
Related Mcqs:
- The process each manager follows during the life of a project is known as ___________________?
- A. Project Management B. Manager life cycle C. Project Management Life Cycle D. All of the mentioned...
- Which model was used during the early stages of software engineering, when prototyping of user interfaces, consideration of software and system interaction, assessment of performance, and evaluation of technology maturity were paramount ?
- A. Early design stage model B. Post-architecture-stage model C. Application composition model D. All of the mentioned...
- Which risks are associated with constraints imposed by management or the marketplace ?
- A. Business impact risks B. Process definition risks C. Product size risks D. Development environment risks...
- Which of the following is not a project factor that should be considered when planning the structure of software engineering teams ?
- A. The difficulty of the problem to be solved B. High frustration caused by personal, business, or technological factors that causes friction among team members C. The degree of sociability required for the project D. The rigidity of the delivery date...
- Which of the following process ensures that versions of systems and components are recorded and maintained?
- A. Codeline B. Configuration control C. Version D. Workspace...