Search
.Management Sciences
A. Software Product Engineering
B. Software Quality Assurance
C. Software Subcontract Management
D. Software Quality Management
Explanation: In CMM planning these activities is described in Software Project Planning, however the life cycle activities of requirements analysis, design, code, and test are described in Software Product Engineering.
Related Mcqs:
- Reverse engineering is the last activity in a re-engineering project _____________________?
- A. True B. False...
- What does ACT stands for in In Boehm model for software maintenance ?
- A. Actual change track B. Annual change track C. Annual change traffic D. Actual change traffic...
- What are the goals to gain Laboratory Accreditation ?
- A. Increase availability of testing services through third-party laboratories B. Increase availability of testing market to encourage development of software testing industry C. Reduce cost by increasing supply of testing services D. All of the mentioned...
- CSQA stands for __________________?
- A. Certified Software Quality Analyst B. Certified Software Quality Approved C. Certified Software Quality Acclaimed D. None of the mentioned...
- Degree to which design specifications are followed in manufacturing the product is called_________________?
- A. Quality Control B. Quality of conformance C. Quality Assurance D. None of the mentioned...
Recent Comments