A. the minimum time required for completion of project
B. the maximum time required for completion of project
C. maximum cost required for completion of project
D. minimum cost required for completion of project
E. none of the above
Related Mcqs:
- For a product layout the material handling equipment must _________________?
- A. have full flexibility B. employ conveyor belts, trucks, tractors etc. C. be a general purpose type D. be designed as special purpose for a particular application E. arranging shops according to specialization of duties...
- An optimum project schedule implies_______________?
- A. optimum utilization of men, machines and materials B. lowest possible cost and shortest possible time for project C. timely execution of project D. to produce best results under given constraints E. realistic execution time, minimum cost and maximum profits...
- The deductions for, employees provident fund start________________?
- A. immediately on joining the service B. after 60 days of joining the service C. after 100 days of joining the service D. after 240 days of joining the service E. after one year of joining the service...
- Scheduling gives information about____________________?
- A. when work should start and how much work should be completed during a certain period B. when work should complete C. that how idle time can be minimized D. proper utilisation of machines E. none of the above...
- The important file in making a PERT is__________________?
- A. an event can’t be accomplished until activities leading to it are completed B. no activity from any event can be started from preceding event till it is completed C. length of arrow has nothing to do with time D. every activity must be completed before end point is reached E. all of the above...