Search
.Management Sciences
A. optimistic time
B. pessimistic time
C. most likely time
D. all of the above
E. none of the above
Related Mcqs:
- Standard time is defined as ____________________?
- A. normal time + allowances B. normal time + idle time + allowances C. normal time + idle time D. only normal time for an operation E. none of the above...
- In which of the following layouts, the lines need to the balanced_______________?
- A. process layout B. product layout C. fixed position layout D. plant layout E. functional layout...
- According to MAPI formula, the old machine should be replaced by new one when_____________?
- A. CAM < DAM B. CAM > DAM C. CAM = DAM D. there is no such criterion E. none of the above (CAM = Challenger’s Adverse minimum DAM = Defender’s Adverse minimum)...
- PMTP (predetermined motion time systems) include___________________?
- A. MTM (method time measurement) B. WFS (work factor systems) C. BNTS (basic motion time study) D. all of the above E. none of the above...
- Pick up the incorrect statement from the following?
- A. an activity of the project is denoted by an arrow on the net work B. the tail of the arrow indicates the start of the activity C. the head of the arrow indicates the end of,the activity! D. the arrows are drawn (to scale from) left to right E. each activity consumes a given … Pick up the incorrect statement from the following?Read More...